An expert analytical approach to reducing construction project delays from ineffective scheduling

dc.contributor.authorJoseph, O. S
dc.contributor.authorFadugba, O. G
dc.contributor.authorOluyemi-Ayibiowu, B. D
dc.contributor.authorUduebor, M. A
dc.contributor.authorOlu-Matins, O. A
dc.date.accessioned2025-09-30T19:22:03Z
dc.date.available2025-09-30T19:22:03Z
dc.date.issued2025
dc.description.abstractThe study investigated the effects of ineffective scheduling on the completion of construction projects, identified causes of poor planning and scheduling, and provided expert-recommended solutions. Using a mixed-method approach including online surveys, physical questionnaires, and statistical analysis (Relative Importance Index - RII, Reliability Test, and SPSS), the research analyzed data from 130 construction professionals in Nigeria. The most significant effects of ineffective scheduling were "Time Overrun" (RII = 0.8892) and "Cost Overrun" (RII = 0.8246), followed by "Compromise of Project Quality" (RII = 0.8077). The top causes identified were "Poor Decision-Making Regarding Activity Criticality" (RII = 0.8631), "Lack of Finance for Project Execution" (RII = 0.8492), and "Lack of Expertise in Scheduling" (RII = 0.8123). The study concludes by offering a comprehensive roadmap for stakeholders to enhance scheduling efficiency, reduce delays, and improve overall project performance through practical strategies such as accurate cost estimation, effective planning, stakeholder engagement, and the use of scheduling software.
dc.identifier.citationJoseph, O. S., Fadugba, O. G., Oluyemi-Ayibiowu, B. D., Uduebor, M. A., & Olu-Matins, O. A. (2025). An expert analytical approach to reducing construction project delays from ineffective scheduling. KIU Journal of Science, Engineering and Technology, 4(1), 142–150. https://doi.org/10.59568/KJSET-2025-4-1-14
dc.identifier.otherhttps://doi.org/10.59568/KJSET-2025-4-1-14
dc.identifier.urihttp://hdl.handle.net/20.500.12493/2955
dc.language.isoen
dc.publisherKIU Journal of Science, Engineering and Technology
dc.rightsAttribution-NonCommercial-NoDerivs 3.0 United Statesen
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/us/
dc.subjectConstruction
dc.subjectDelay
dc.subjectEfficiency
dc.subjectProject Quality
dc.subjectScheduling
dc.titleAn expert analytical approach to reducing construction project delays from ineffective scheduling
dc.typeArticle

Files

Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
An expert analytical approach to reducing construction project delays from ineffective scheduling.pdf
Size:
8.06 MB
Format:
Adobe Portable Document Format
License bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: